Telok Gong, Klang, Selangor · Manufacturing · Server / operations stop

Batching PC failed during morning concrete pours

A single dispatch computer going blind left mixer drums at risk of hardening on the road.

Indicative exposure
RM 76,000
Typical protection range
Solution B on our assessment

What went wrong

The central dispatch hard drive failed at peak morning pours. Routing and batching went offline.

What it cost if nothing changed

Hardened concrete in drums plus site delay claims — about RM 76,000 per incident.

What we would put in place

We replaced the desktop with a mirrored production server and monitoring so disk failure is caught before the morning pour window.

The outcome we design for

Dispatch stays available through a disk failure instead of stopping the fleet.

This is an anonymized composite scenario used to explain a failure pattern. It is not a named client case study or a guaranteed quote. Actual scope comes from the assessment.

If this is close to your situation, start with the same assessment we use to map Solution A–G.

Start the assessment