What went wrong
The central dispatch hard drive failed at peak morning pours. Routing and batching went offline.
What it cost if nothing changed
Hardened concrete in drums plus site delay claims — about RM 76,000 per incident.
What we would put in place
We replaced the desktop with a mirrored production server and monitoring so disk failure is caught before the morning pour window.
The outcome we design for
Dispatch stays available through a disk failure instead of stopping the fleet.
This is an anonymized composite scenario used to explain a failure pattern. It is not a named client case study or a guaranteed quote. Actual scope comes from the assessment.